• Description: Construction of a tunnel from Seljestad to Sama (section T10.5) including the entryways. Two escape/exhaust tunnels on the T5 section will also be built. Drainage works will also be carried out for the tunnel from the construction site to the sea, as well as asphalting, constructing a provisional road, railings, stone walls, signage, and landscaping.
  • Location: Nordland, Norway
  • Client: Statens Vegvesen (Nord Region)
  • Cost: 294.560.000,00 NOK
  • Term for completion: 27 months
  • Predicted completion date: March 2019